this post was submitted on 17 Jul 2026
45 points (95.9% liked)

Technology

43277 readers
299 users here now

A nice place to discuss rumors, happenings, innovations, and challenges in the technology sphere. We also welcome discussions on the intersections of technology and society. If it’s technological news or discussion of technology, it probably belongs here.

Remember the overriding ethos on Beehaw: Be(e) Nice. Each user you encounter here is a person, and should be treated with kindness (even if they’re wrong, or use a Linux distro you don’t like). Personal attacks will not be tolerated.

Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 4 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] verstra@programming.dev 16 points 6 days ago (2 children)

dousing them with a mixture of hydrogen peroxide, acetic acid, salt, and acrylic paint

Is there a civil engineer here who would know what degree of damage will this cause?

[–] impairedimperator@lemmy.zip 14 points 6 days ago (2 children)

Pretty minor. If they picked up the whole data center and soaked it in a large jug of 10% acetic acid for about nine months, the concrete would lose about 20% of its strength.

Not sure about the civil engineering side, but I assume there's enough safety factor in your average construction to account for 20% strength loss.

[–] village604@adultswim.fan 3 points 6 days ago (1 children)

That safety margin is supposed to last many years, though. If it's removed before the building is even constructed, it might have to be re-poured.

[–] impairedimperator@lemmy.zip 9 points 6 days ago (1 children)

Yeah, but we're talking about literally soaking the entire building in concentrated vinegar for months, not throwing a water balloon of regular vinegar at it. This particular case probably didn't do anything

[–] village604@adultswim.fan 2 points 6 days ago
[–] BlameThePeacock@lemmy.ca 11 points 6 days ago

Not an engineer but vinegar (ascetic acid) at full strength applied early enough during curing could be a problem. If it's the watered down stuff for home use and the concrete was already partially cured it wouldn't do almost anything.