No one cares. Doug Ford has been paid, and Brookfield makes datacentres.
Canada
What's going on Canada?
Related Communities
🍁 Meta
🗺️ Provinces / Territories
- Alberta
- British Columbia
- Manitoba
- New Brunswick
- Newfoundland and Labrador
- Northwest Territories
- Nova Scotia
- Nunavut
- Ontario
- Prince Edward Island
- Quebec
- Saskatchewan
- Yukon
🏙️ Cities / Local Communities
- Anmore (BC)
- Burnaby (BC)
- Calgary (AB)
- Comox Valley (BC)
- Edmonton (AB)
- East Gwillimbury (ON)
- Greater Sudbury (ON)
- Guelph (ON)
- Halifax (NS)
- Hamilton (ON)
- Kingston (ON)
- Kootenays (BC)
- London (ON)
- Mississauga (ON)
- Montreal (QC)
- Nanaimo (BC)
- Niagara Falls (ON)
- Niagara-on-the-Lake (ON)
- Oceanside (BC)
- Ottawa (ON)
- Port Alberni (BC)
- Regina (SK)
- Sarnia (ON)
- Saskatoon (SK)
- Squamish (BC)
- Thunder Bay (ON)
- Toronto (ON)
- Vancouver (BC)
- Vancouver Island (BC)
- Victoria (BC)
- Waterloo (ON)
- Whistler (BC)
- Windsor (ON)
- Winnipeg (MB)
Sorted alphabetically by city name.
🏒 Sports
Baseball
Basketball
Curling
Hockey
- Main: c/Hockey
- Calgary Flames
- Edmonton Oilers
- Montréal Canadiens
- Ottawa Senators
- Toronto Maple Leafs
- Vancouver Canucks
- Winnipeg Jets
Soccer
- Main: /c/CanadaSoccer
- Toronto FC
💻 Schools / Universities
- BC | UBC (U of British Columbia)
- BC | SFU (Simon Fraser U)
- BC | VIU (Vancouver Island U)
- BC | TWU (Trinity Western U)
- ON | UofT (U of Toronto)
- ON | UWO (U of Western Ontario)
- ON | UWaterloo (U of Waterloo)
- ON | UofG (U of Guelph)
- ON | OTU (Ontario Tech U)
- QC | McGill (McGill U)
Sorted by province, then by total full-time enrolment.
💵 Finance, Shopping, Sales
- Personal Finance Canada
- Buy Canadian
- BAPCSalesCanada
- Canadian Investor
- Canadian Skincare
- Churning Canada
- Quebec Finance
- Canada Grown Business
🗣️ Politics
- General:
- Federal Parties (alphabetical):
- By Province (alphabetical):
🍁 Social / Culture
- 2 North American 4 You (Shitposting & Memes, North America focus)
- Ask a Canadian
- Bières Québec
- Canada Francais
- Canadian Gaming
- Eh Buddy Hoser (Shitposting & Memes, Canada focus)
- EhVideos (Canadian video media)
- First Nations
- First Nations Languages
- Indigenous
- Inuit
- Logiciels libres au Québec
- Maple Music (music)
🌐 Other Relevant Communities
Rules
- Keep the original title when submitting an article. You can put your own commentary in the body of the post or in the comment section.
Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage: lemmy.ca
Majority of Canadians can't think critically.
I know the anti-AI crowd doesn't want to hear anything about "facts", but AI datacenters do not actually use that much energy compared to other industries, they don't particularly harm the environment compared to other industries, and they aren't causing water issues in Canada because we aren't building them in deserts like the stupid Americans.
The numbers sound big when "GIGAWATT DATACENTER" is being broadcast in the news, However, in the scale of other industries it's pretty reasonable considering we don't need one in every city or anything. Two or three in the entire country maybe. The demand for AI isn't infinite, and the efficiency is getting better fairly rapidly right now.
For context, we built the Kemano Generating Station (A dam near Kitimat) to produce almost 900 MW of power to be used almost exclusively for smelting aluminum, and it's still used for that purpose. 50% of the current generation capacity in BC goes to mining, foresty, and oil/gas accounting for something like 7-8 GW of total power in BC alone.
In Alberta, 75% of electricity produced goes to Industry, which results in an even larger total usage than BC.
BC Hydro has already implemented regulations to restrict AI datacenters to 300MW of new capacity per year to keep things stable based on them building capacity, so if anything it will likely keep energy prices down for consumers because of the stable growth and predictability. BC hydro completed purchasing agreements for an additional 8 Gigawatts of Wind and Solar at 7.4 cents per KWH to start coming online at the beginning of the 2030s.
Not sure why they think there's going to be a ton of environmental harm, BC has one of the cleanest energy grids in the world and we're not adding new fossil fuel plants or anything at this point. They are extending some existing ones, but it's literally two plants. Alberta's new Meta datacenter is going to burn Natural gas that would otherwise be exported to be burned to power datacenters elsewhere, which just saves on needing pipeline capacity for that export.
Water use is another bullshit argument, again, we aren't building these datacenters in a desert. The two proposed datacenters in BC that everyone is yelling about, and the Gigawatt Meta datacenter in Alberta aren't even the type that uses water evaporative cooling, so they will have no impact on water consumption. Our climate here in Canada doesn't require evaporative water cooling as the only option, we can build them with closed systems and the companies are already picking those options because they don't want to piss people off.