this post was submitted on 27 Apr 2026
266 points (99.3% liked)

Fuck AI

8217 readers
2382 users here now

"We did it, Patrick! We made a technological breakthrough!"

A place for all those who loathe AI to discuss things, post articles, and ridicule the AI hype. Proud supporter of working people. And proud booer of SXSW 2024.

AI, in this case, refers to LLMs, GPT technology, and anything listed as "AI" meant to increase market valuations.

founded 2 years ago
MODERATORS
all 31 comments
sorted by: hot top controversial new old
[–] etherphon@piefed.world 60 points 4 months ago (2 children)

If it's got Kevin O'Leary's name attached to it you know this is some bullshit technology aimed solely at amassing more wealth. Gee whatddya know.

[–] SaveTheTuaHawk@lemmy.ca 4 points 4 months ago

O'Leary is a chronic loser. He's the Donald Trump of Canadian investors.

[–] a_non_monotonic_function@lemmy.world 3 points 4 months ago (1 children)

Why else are they building these?

[–] etherphon@piefed.world 1 points 4 months ago

It was poorly put I admit, I should have said transferring wealth from the pockets of the workers and creators to the vampire ghoul class. I do wonder what they've been sold though, I feel like some of them think whoever gets to AGI first will literally be the ruler of the universe.

[–] ruuster13@lemmy.zip 29 points 4 months ago (1 children)

...the campus would reach 9 GW, all produced on-site through a connection to the Ruby Pipeline, a 680-mile interstate natural gas line that crosses northern Utah on its route from Wyoming to Oregon

This is so exciting! Hey Wyoming and Oregon, aren't you so excited for your natural gas prices to increase?

[–] Hideakikarate@sh.itjust.works 11 points 4 months ago

And I'd be willing to bet that Wyoming and Oregon had even less say in its construction.

[–] Witchfire@lemmy.world 27 points 4 months ago

...and the people of Utah will pay for the increased power costs

[–] homes@piefed.world 23 points 4 months ago

That’s 7.438 trips back to the future

Great Scott!

[–] ivanafterall@lemmy.world 21 points 4 months ago (1 children)

I moved from Utah around the time they were having a drought so severe the Governor advised praying for rain.

Anyway, hopefully this doesn't need too much water. I'm sure it won't be an issue.

[–] HeyThisIsntTheYMCA@lemmy.world 3 points 4 months ago* (last edited 4 months ago) (1 children)

You realize how little that narrows it down

Also maybe they can use all the water they're pumping out of Heber

[–] JoeBigelow@lemmy.ca 3 points 4 months ago (1 children)

Hey the Jordanelle wasn't meant to hold water!

[–] HeyThisIsntTheYMCA@lemmy.world 2 points 4 months ago (1 children)

right and i bet the mormon pope doesn't shit in the woods neither

[–] JoeBigelow@lemmy.ca 3 points 4 months ago

I used to live in the Deer Valley housing beneath the dam. They don't tell you it's directly over a fault line

[–] rounding_error@lemmy.today 16 points 4 months ago (1 children)
[–] LemmyFeed@lemmy.dbzer0.com 10 points 4 months ago

What an asshole

[–] Humana@lemmy.world 15 points 4 months ago

But how much water? This winter the Rockies had their lowest recorded precipitation ever

[–] HeyThisIsntTheYMCA@lemmy.world 9 points 4 months ago

Huh. I wonder what this will do to the great arsenic lake

[–] WalrusDragonOnABike@reddthat.com 9 points 4 months ago (1 children)

O'Leary Digital is also developing a companion Wonder Valley campus in Alberta, Canada, announced in 2024, which has not yet broken ground.

So this is probably just part of the charade of fake promises to make circular payments between a handful of companies that will not ever even show up in quarterly/annual report or affect planned production by any of the players that would be needed to supply computer hardware to actually make such actually possible like so many other of these projects, presumably to make number-go-up now?

[–] Brown5500@sh.itjust.works 1 points 4 months ago

Caterpillar is supposed to provide the natural gas generators for this project and they have been pretty publicly excited about that. They seem to believe that the orders are at least real.

[–] OrteilGenou@lemmy.world 6 points 4 months ago

So, this might be a silly question but, why not use the saltwater to cool the data center while using the heat to capture and condense fresh water, then transfer it to the local community for use as drinking water?

Oh what's that? Fuck me? Who said that? Kevin O'Leary? TV's Kevin O'Leary? We'll that's decidedly un-Canadian of him.

[–] Kazumara@discuss.tchncs.de 5 points 4 months ago

Do you think even 1 GW will be built, or will they go bankrupt before?

[–] SandraBollocks@lemmy.world 4 points 4 months ago

burn it down harmonica solo

[–] Tar_alcaran@sh.itjust.works 2 points 4 months ago

Oh don't worry, they'll never build it.

[–] quick_snail@feddit.nl -1 points 4 months ago* (last edited 4 months ago) (2 children)

I really don't care. Energy is abundant.

Easy solution: just require them to fund the creation of renewable energy plants (wind or solar) which generate 200% of their daily usage every 24 hours. When those plants have been built and output is measured to meet their usage, they can begin construction. easy.

[–] GalacticGrapefruit@lemmy.world 11 points 4 months ago

The Great Salt Lake is drying up, exposing an urban center with a population of over a million people to airborne arsenic, selenium, and radioactive elements that would otherwise be locked in the lakebed.

Around 30% of the population of Salt Lake County is under the age of 18.

Give a shit. Please.

[–] Raiderkev@lemmy.world 2 points 4 months ago

Psst, I don't think the guy who's bought by oil and gas is going to do that.